Home Facts History Gallery Blog Videos Events Links

Nene Valley Railway, Wansford Station, Stibbington, Peterborough, PE8 6LR

Tel: 01780 784444

July 2018

Parts removed count:

1289

June 2018.  

The frames begin to look very bare.

Much needs to be done before painting can begin - all the grey is old primer and requires wire-brushing off.  We aim to start painting as the weather warms next spring.  







The bogie, now with wheels and springs removed, has been turned upside-down and is being stripped back to bare metal.

The tender wheels, dumped in the yard and awaiting transport to wheel-turning.


To protect the bores, plywood ends for cylinders and piston valves have been fabricated and fixed.

These will remain in place until the frame strip-down is complete.



May 2018